On-time %
68%
At risk
Avg lead time
42d
12d vs promised
Open POs
2
SKUs sourced
6

Lead-time history

Last 20 POs · bars above the dashed line are late

30d promised
20 POs agoToday

SKUs sourced from this supplier

6 active SKUs

SKU Name Category On-hand Lead time ABC
FAST-0401 Hex cap screw, 3/8-16 x 1" zinc (100pk) Industrial Fasteners 78 45d B Open
FAST-0402 Hex nut, 3/8-16 zinc (500pk) Industrial Fasteners 42 45d C Open
FAST-0403 Flat washer, 3/8 SAE zinc (500pk) Industrial Fasteners 120 45d C Open
FAST-0404 Lag screw, 1/2 x 4" hot-dip galv (50pk) Industrial Fasteners 26 45d B Open
FAST-0405 Concrete anchor, 3/8 x 3" wedge (50pk) Industrial Fasteners 58 45d B Open
FAST-0411 Structural bolt, A325 3/4 x 2-1/2 (50pk) Industrial Fasteners 4 45d B Open