PO HVAC-0102 3-ton condenser fan motor, 1/4 hp
30 EA
$4.4K

Emergency replenishment: 0 on-hand, active stockout. 30-unit PO covers 23 days of demand post-arrival.

Midwest HVAC Components Confidence 94%
PO PLMB-0205 Ball valve, 1" full port brass
48 EA
$2.0K

Stockout + no inbound. 9-day lead time. Qty = 2x safety stock + lead-time demand buffer.

Northstar Copper & Brass Confidence 92%
PO FAST-0411 Structural bolt, A325 3/4 x 2-1/2 (50pk)
40 BOX
$3.1K

Structural bolt on-hand at 4 units; 42-day Guangzhou lead time. Larger qty to avoid repeat exception before next shipment cycle.

PO HVAC-0104 R-410A refrigerant, 25 lb cylinder
60 EA
$12.9K

R-410A trending into peak cooling season. Current on-hand 8 units, supplier on-time rate 72% — padded qty.

PO HVAC-0106 Evaporator coil, 2.5-ton upflow
20 EA
$6.0K

Evaporator coil crossed reorder threshold. 21-day supplier lead time. Qty = reorder point + 1 lead cycle.

Midwest HVAC Components Confidence 83%
PO HVAC-0114 Condensate pump, 120v 20' lift
36 EA
$2.6K

Condensate pump at reorder boundary. 12-day lead time. Standard replenishment cycle.

Voltpro Electric Supply Confidence 81%
PO ELEC-0302 THHN wire, 10 AWG white 500'
24 EA
$4.4K

10 AWG white — forecast drift detected (actuals at p70 for 6 days). Preemptive order to avoid crossing reorder point next week.

Copperfield Wire & Cable Confidence 76%
PO HVAC-0112 TXV, 3-ton R-410A
18 EA
$1.7K

TXV 3-ton — approaching reorder over next 10 days. Pair with HVAC-0101/0102 ship to consolidate freight.

Midwest HVAC Components Confidence 78%
PO PLMB-0208 Push-to-connect fitting, 1/2" x 3/4"
48 BOX
$3.3K

Push-to-connect — standing demand with Northstar open PO. Consolidate onto REC-002 shipment.

Northstar Copper & Brass Confidence 82%
PO ELEC-0309 LED panel, 2x4 recessed 40W 4000K
36 EA
$2.4K

LED panel — demand trend +12% over 60 days. Preemptive replenishment before hitting reorder in ~14 days.

Ironline Hardware Supply Confidence 72%
Transfer HVAC-0102 3-ton condenser fan motor, 1/4 hp
10 EA
$1.5K

Emergency transfer — WH-02 has 18 units, WH-01 is stocked-out. Covers gap until PO REC-001 arrives.

WH-02 → WH-01 Confidence 96%
Transfer HVAC-0110 Drain pan, 26" poly with overflow
80 EA
$3.0K

Rebalance overstock. WH-01 has 220 units (200+ days cover); WH-03 running low.

WH-01 → WH-03 Confidence 74%
Transfer PLMB-0207 Wax ring, standard toilet
200 BOX
$840

Overstock rebalance. Freight cost below the carrying cost savings at 275 days of cover.

WH-01 → WH-03 Confidence 68%
Transfer ELEC-0303 Circuit breaker, 20A single-pole
40 EA
$312

20A breaker demand surge at WH-01. Transfer from WH-02 avoids expediting a PO.

WH-02 → WH-01 Confidence 84%
Transfer HVAC-0103 Thermostat, 7-day programmable
30 EA
$1.8K

Thermostat demand +28% at WH-01. WH-02 has slack capacity. Faster than PO replenishment.

WH-02 → WH-01 Confidence 80%